Arbeidsgiver
Statens vegvesen, N0-6863 Leikanger
Designer/planlegger/formgiver
Norconsult AS, N0-4020 Stavanger
Gjennomføring av arbeid
Marti IAV Solbakk DA
Firmapartner
Marti Contractors Ltd., CH-Moosseedorf
Marti Norge AS, NO-Oslo
TuCon a.s., SK-Zilina -Banova
IAV hf, IS-Reykjavik
Hovedentreprenør
Marti Contractors Ltd., CH-Moosseedorf
Teknisk ledelse
Marti Contractors Ltd., CH-Moosseedorf
Kommersiell leder
IAV hf, IS-Reykjavik
Mer…
Mindre…
Arbeidets omfang
The contract includes the northern part of the Solbakktunnel, which comprises two conventionally excavated two line tubes (2 x 8 km) incl. Roadwork and sea-filling.
The whole tunnel is under sea-level.
Fullføringstid/gjennomføringstid
2013 - 2018
Kontraktssum
CHF 206 Mio. (NOK 1 '313 Mio.)
Aktiviteter
Hole drilling for grouting: 130'000 m
Grouting material: 4.3 Mio. kg
Tunnel excavation: 1.3 Mio. m3
Rock bolts: 470'000 m
Shotcrete: 57'000 m3
Reinforcement steel for rock support: 300 t
Lining: 120'000 m2
(PE-foam and concrete elements)
Concrete portals: 2
Sea-fillings with blasted rock: 1.1 Mio. m3
Roadwork total length: 17 km
(tunnel and outside)
Kontakt
Marti Contractors Ltd.
Seedorffeldstrasse 21
CH-3302 Moosseedorf
Tel. +41 31 388 75 20
Fax +41 31 388 75 21
contractors@martiag.ch