Byggherre
Jernbaneverket Utbygging
Norwegian National Rail Administration
Designer/planlegger/formgiver
RambøII and Norconsult
Gjennomføring av arbeid
Marti IAV DA
Firmapartner
Marti Contractors Ud., CH-Moosseedorf
IAV hf, IS-Reykjavik
Hovedentreprenør og teknisk ledelse
Marti Contractors Ud., CH-Moosseedorf
Kontraktssum
CHF 65 million
Mer…
Mindre…
Arbeidets omfang
Double track railroad tunnel
L = 2100 m, A =135m2
Two escape tunnels with a combined length of 693 m
Tjenester tilbudt
- Excavation by drill and blast with a 3-arm jumbo boring rig
- Total volume of rock to be excavated: 310 000 m3
- Complete tunnel needs to be pre-injected
- 320m long entrance galleries (53m2)
- 380 m long safety galleries (24m2)
- Waterand frost protection of the main tunnel consists of concrete lining pannels with a total surface of 55 230 m2