Employer
DB Projektbau GmbH, DE-76137 Karlsruhe
Designer
Planungsgemeinschaft Katzenbergtunnel
Ed. Züblin + Wayss & Freytag Ingenieurbau
Time of Completion
2003 – 2010
Contract Sum
CHF 400 Mio.
Execution of the Work
Ed. Züblin AG, DE-70435 Stuttgart
Wayss & Freytag Ingenieurbau, DE-60489 Frankfurt
Marti Tunnelbau AG, CH-3302 Moosseedorf
Jäger Bau GmbH, AT-6780 Schruns
Lead Company
Ed. Züblin AG, DE-70435 Stuttgart
Commercial Lead
Wayss & Freytag Ingenieurbau, DE-60489 Frankfurt
More…
Less…
Scope of the Works
New Railway tunnel Karlsruhe-BaselSection of planning 9.1 direction Schliengen-Eimeldingen- 2 tunnels of 9'385 m, of that 8'984 m with tunnel boring machine- 19 pces cross cuts (all 500 m)- 2 pces ventilation shafts Ø = 6 m, H = ca. 70 m
Activities
- TBM drive Ø = 11.16 m
- 2 EPB-Earth pressure balanced shielded tunnel boring machines with single concrete segmental lining
- Concrete segments up to 9 bar pressure of water
- Tickness of the segments: D = 60 cm
- Concrete floor and shoulders
- Water pipes for fire-fighting
- Innerlining concrete for cross cuts with up to 9 bar pressure
- Installation of handrails and doors
Contact
Marti AS
Karenslyst allé 4b
0278 Oslo
Tel. +47 23 12 06 55
Fax +47 23 12 05 10
info@marti-norge.no