Toggle navigation
Marti Group
Multimedia
Jobs / People
Projects
NO
About us
Portrait
Locations
Construction Sites
Integrated Management
Equality
Contact
Competences
Tunneling construction
Conveying technology
Plant engineering
Electrical engineering
Sealing & Grouting
Raiseboring
References
Tunneling
Conveying Technology
Sealing / Water Shielding / Injections
Water Treatment
News
Page Image
Projects
Løvstakk
Nordnes
Skullerud
Snekkestad
Solbakk
Projects
Løvstakk
Nordnes
Skullerud
Snekkestad
Solbakk
Key facts about
Nordnes
Total project is 5’810 m long (T9.5, 71 m²) double lane road tunnel, 100m bridge, technical room caverns and tunnel widenings
C
onstruction site located over the arctic circle
M
ountain at high risk for big landslides, local permafrost
Geology: Gneiss
Excavation method: drill & blast
Excavated length and volume: 5’970 m, 470’000 m³
Inner lining PE-foam & shotcrete: 70’000 m²
Portals cut & cover: 50 m and 15 m
One 100 m long bridge (prestressed, 450t reinforcement, 2’000 m³ concrete)
Dredging of sea bottom and new filling for a new secondary road (49’000 m³)
Dumping of excavated material at sea (420’000 m³)