​News


25.10.2022
Hand over of Løvstakken project
11.10.2022
The Skullerud team has reached a major milestone
06.05.2022
Final installation of water pipes and district heating in escape tunnel Lovstakken
14.01.2022
Breakthrough in Oslo
13.07.2021
IN BERGEN (NO), A NEW CONNECTION IS BEING CREATED BETWEEN TWO PARTS OF THE CITY
 
Marti AS
Karenslyst allé 8b
0278 Oslo

      


​​​​​​​​